MES Logo

We are an established consultancy practice specialising in providing sustainable building solutions throughout the UK.

01636 653055 info@mesbuildingsolutions.co.uk
Back to top

CIBSE TM52 & TM59

  /  CIBSE TM52 & TM59

CIBSE TM52 & TM59 Overheating Assessments

Robust thermal comfort analysis to support compliant, resilient building design

Robust thermal comfort assessments to demonstrate Part O compliance and reduce overheating risk.

Overheating in buildings is an increasingly critical issue driven by climate change, higher levels of insulation, and greater glazing ratios. For this reason, Approved Document O places a strong emphasis on early design decisions that limit unwanted heat gains while maintaining occupant comfort.

CIBSE TM52 and TM59 provide the technical framework used to assess overheating risk through Dynamic Simulation Modelling (DSM). TM52 is generally applied to non-domestic buildings, while TM59 is used for residential developments, including care homes and student accommodation.

MES Building Solutions deliver clear, proportionate TM52 and TM59 assessments that integrate seamlessly with Part O compliance, planning submissions, and design development. Our approach focuses on practical mitigation and coordinated design solutions.

Highly glazed building assessed for overheating risk in accordance with CIBSE TM52 & TM59

Recognised Methodologies

Assessments aligned with CIBSE TM52 for non-domestic and TM59 for domestic buildings

Design-Led Advice

Clear recommendations to mitigate overheating risk through fabric, shading, ventilation, and layout

Robust Technical Analysis

Dynamic modelling using industry-standard software and weather files

Planning Ready

Reports suitable for planning submissions, technical assurance, and professional review

When TM52 & TM59 Assessments are Needed

CIBSE TM52 & TM59 are typically required where developments are at greater risk of overheating due to glazing, layout, occupancy type, or location. Compliance or planning conditions may also require robust technical analysis be carried out.

Even where designs appear to meet simplified criteria, changes in form, orientation, or specification can introduce overheating risk.

Part O compliance via the dynamic modelling route

Buildings in high-risk locations

Residential developments with high glazing ratios

Care homes, student accommodation, and BTR schemes

Our TM52 & TM59 Assessments Process

01

Early Risk Screening

Early identification of overheating risk and compliance strategy

02

Dynamic Thermal Modelling

TM52 & TM59 compliant dynamic thermal modelling

03

Mitigation Testing

Testing and refinement of mitigation measures

04

Reports & Support

Clear reporting with ongoing design support

Design measures implemented to mitigate overheating risk under TM52 & TM59 guidance.
Fairway View, Keyworth

What Our Assessments Cover

Our TM52 & TM59 assessments include:

Annual and seasonal overheating analysis

Occupancy-specific internal gains and usage patterns

Solar gains, shading devices, and glazing performance

Natural and mechanical ventilation strategies

Cross-ventilation effectiveness

Climate change and high-risk location weather files

Related Building Physics Services

Additional services and guidance on the topic: